In the Schedule tab, I do not see an add schedule button. I can add a job to an existing Schedule or edit the existing schedule. Please help.
It’s strangely on the bottom of the page.
Reviving this necrothread, could we get it moved up to the top? It just makes more sense to be there given that the per-schedule controls are all top right of each schedule too, etc.