Looking through the Forum there is no was to set the ‘Prune’ through the GUI and you need to run a Pre or post script.
There a guide on how to do this as information not very clear on how to run this.
Looking through the Forum there is no was to set the ‘Prune’ through the GUI and you need to run a Pre or post script.
There a guide on how to do this as information not very clear on how to run this.
You can add a prune job via the schedule tab.